British American Tobacco

Globe house and Dunhill Tobacco of London

Reconfiguring the hot water controls for the building, via rewiring some controls and installing a new control panel plus the power supply. We also had to run out the remote sensor cables. Tested and commissioned at the end. 

Dunhill Tobacco of London Limited

New control panel controlling the ventilation to clear the smoke from the cigar smoking room. This was all linked to a heat recovery unit to improve the energy efficiency of the building. We had to control the temperature in the loft room via aircon as well as the machinery up there